hindesky Posted June 3, 2023 Share Posted June 3, 2023 8 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 6, 2023 Share Posted June 6, 2023 5 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 9, 2023 Share Posted June 9, 2023 Construction Alert: Demolition of Old Sid Richardson College The preparation for the demolition of Old Sid will begin on Wednesday, June 14. Major demolition work will begin on Wednesday, June 28. Dear colleagues, We are writing to share information about the planning and preparation for the demolition of Old Sid Richardson College to make way for Colleges 12 and 13. To that end, the preparation of the Old Sid site will begin on Wednesday, June 14. This includes the placement of construction fences and cutting and capping existing utilities. Major demolition work is set to begin on Wednesday, June 28. The building will be demolished floor by floor, beginning at the top level and working down through to the first floor. While this work is taking place, our team is committed to keeping the site area safe to ensure a smooth operation. To that end, please review the safety precautions listed below: Pedestrian Traffic: As preparation and demolition activities intensify around Old Sid and the South Colleges Lot, please be mindful of heavy pedestrian traffic in these areas. While pathways to New Sid Rich will be maintained on the south side, pedestrians are encouraged to explore alternative access points. Please refer to the pedestrian access map below to assist with that. Vehicle Parking and Traffic: Although some parking spaces will be coned off for construction purposes, parking will remain available in the South Colleges Lot. There will be limited parking capacity during this time. Project site access by construction vehicles will be through Campus Entrances 3 and 4. A flag person will be present to guide and ensure the safety of all individuals in the area. This work is scheduled to complete by October 2023. Should you have any questions or concerns, please do not hesitate to reach out to Tina Hicks, senior project manager, at 713-348-4296 or tinah@rice.edu. Your engagement and support are instrumental in making this transition as seamless as possible. Thank you for your commitment to our campus community, Facilities, Engineering and Planning 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 9, 2023 Share Posted June 9, 2023 Construction Alert: Crane Delivery at Cannady Hall Project A crane delivery is scheduled at the Cannady Hall project site tomorrow, June 8, at 5 a.m. Minimal traffic disruption. Dear colleagues, A crane delivery is scheduled at the Cannady Hall project site tomorrow, June 8, at 5 a.m. The delivery will take place down Laboratory Road, in the opposite direction of traffic. The details of the crane delivery are as follows: Location: The crane will enter campus at Gate 4 off Main Street. The crane will proceed down Alumni Drive to Laboratory Road until it reaches the Cannady Hall construction site. Date and Duration: Thursday morning, June 8, from 5 a.m. to 5:30 a.m. Minimal Traffic Impact: To ensure smooth traffic flow and safety during this period, flag personnel will be present to direct and assist drivers. If you have any questions or concerns, please feel free to contact Facilities Engineering and Planning at 713-348-2485. Sincerely, Larry Vossler, Assistant Director for Project Planning and Management 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 11, 2023 Share Posted June 11, 2023 Cannady Hall crane. Unfortunately they have cut down some of the Oak trees around the old Sid Richardson College. 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 25, 2023 Share Posted June 25, 2023 New Hanszen College Mass Timber. Two new colleges will go here after they demolish the old Sid Richardson. Looks like they have been doing interior demolition. Cannady Hall. 7 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 27, 2023 Share Posted June 27, 2023 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 28, 2023 Share Posted June 28, 2023 Building demo permit at gate 4 which is the entrance to the old Sid Richardson. 1 Quote Link to comment Share on other sites More sharing options...
ChannelTwoNews Posted June 30, 2023 Share Posted June 30, 2023 https://www.bizjournals.com/houston/news/2023/06/29/rice-stadium-undergoes-renovations.html?cx_testId=40&cx_testVariant=cx_27&cx_artPos=3#cxrecs_s "Many of the upgrades this year will be in premium spaces in the stadium, Joe Karlgaard, director of athletics, recreation and lifetime fitness at Rice, told the Houston Business Journal at the end of May. The university is gutting the south side club and reconfiguring the layout and bar area of the space. The stadium will also feature two new “party decks” — one on the northwest corner of the stadium and the other on the southeast — which will include premium bars and other amenities." 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 30, 2023 Share Posted June 30, 2023 Exciting news about the two new college buildings that will be going up. Talked with a worker from Anslow Bryant who is the GC company building them both and also the servery. It will be two 12 story concrete buildings with the servery in the middle of them. Demolition of the old Sid Richardson has started. JTB Demolition got the demo contract. https://www.jtbservices.com https://www.anslowbryant.com Anslow Bryant also built the new Sid Richardson building and the Ralph O'Connor Science building. 3 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 6, 2023 Share Posted July 6, 2023 I wonder if this is going to affect his winning design for the new student center at Rice? "The Financial Times reported that Adjaye allegedly engaged in sexual misconduct with employees in 2018 and 2019 while working on projects. Adjaye and his firm are accused of “different forms of exploitation — from alleged sexual assault and sexual harassment by him to a toxic work culture — that have gone unchecked for years,” the FT said. At least two projects have been affected by the allegations. Multnomah County Public Library in Oregon has cut ties with the firm which also has been removed rom the UK's Holocaust memorial project." https://www.bisnow.com/national/news/architecture-design/architect-david-adjaye-loses-business-in-wake-of-sexual-misconduct-allegations-119669 https://www.ft.com/content/1a03a13c-a0b3-41c9-9a7b-702719ac6d58 1 Quote Link to comment Share on other sites More sharing options...
mkultra25 Posted July 6, 2023 Share Posted July 6, 2023 6 hours ago, hindesky said: I wonder if this is going to affect his winning design for the new student center at Rice? Wow. I can't imagine that Rice will continue the relationship with him in light of these allegations. That would certainly explain why the Memorial Center demolition that was supposed to start at the end of the spring semester hasn't happened yet - in fact, they don't even appear to have moved anything out of the building, or made any of the visible preparations you'd expect for an impending demolition. I was just on campus a couple of days ago and although I didn't go inside the Memorial Center, looking inside through the glass doors it appeared to be business as usual there. Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 9, 2023 Share Posted July 9, 2023 9 Quote Link to comment Share on other sites More sharing options...
mkultra25 Posted July 10, 2023 Share Posted July 10, 2023 Not exactly a ringing endorsement from Rice, to say the least: New student center’s architect accused of sexual misconduct 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 15, 2023 Share Posted July 15, 2023 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 22, 2023 Share Posted July 22, 2023 Cannady Hall. Old Sid Richardson College. 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 29, 2023 Share Posted July 29, 2023 They are taking the old Sid Richardson College down the same way the 2100 Memorial Senior Living was taken down. From the top down using a tracked jack hammer and a skid steer. New Hanszen College has timber building. Cannady Hall. 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 31, 2023 Share Posted July 31, 2023 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 5, 2023 Share Posted August 5, 2023 Old Sid Richardson College. Cannady Hall. 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 13, 2023 Share Posted August 13, 2023 Old Sid Richardson College. Cannady Hall. This is O-Week, classmates from the colleges were at all the entrances welcoming the new and returning students. 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 13, 2023 Share Posted August 13, 2023 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 19, 2023 Share Posted August 19, 2023 Cannady Hall. Old Sid Richardson College demolition. 7 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 23, 2023 Share Posted August 23, 2023 "The new student center project has been delayed again, dean of undergraduates Bridget Gorman announced in an Aug. 21 email obtained by the Thresher. Rice has chosen to ‘reset’ the project, firing the architecture firm, Adjaye Associates." https://www.ricethresher.org/article/2023/08/rice-to-reset-student-center-rebuild-hire-new-architecture-firm 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 23, 2023 Share Posted August 23, 2023 "Rice is currently renovating the bike track used for Beer Bike, which involves repaving the asphalt and repainting track markers, according to an Aug. 9 email from the Facilities and Capital Planning department. The project began on Aug. 8 and is scheduled to be completed by Sept. 6" https://www.ricethresher.org/article/2023/08/rice-renovates-bike-track 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 24, 2023 Share Posted August 24, 2023 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 25, 2023 Share Posted August 25, 2023 3 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 26, 2023 Share Posted August 26, 2023 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 26, 2023 Share Posted August 26, 2023 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 26, 2023 Share Posted August 26, 2023 Ralph O'Connor Science building. North side. East side. South side. West side. Northeast corner. 5 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 26, 2023 Share Posted August 26, 2023 Cannady Hall. 6 Quote Link to comment Share on other sites More sharing options...