hindesky Posted August 2, 2023 Share Posted August 2, 2023 Proposed plat. Looks like Randall Davis owns it. 2 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted August 25, 2023 Author Share Posted August 25, 2023 (edited) Unfortunately I missed the first half hour of the Planning Commission meeting so I don't know if this plat was approved. But Randal Davis has a TDLR for 7 story mid rise multifamily. Architect - https://goree.com Edited August 25, 2023 by hindesky 5 Quote Link to comment Share on other sites More sharing options...
ChannelTwoNews Posted August 25, 2023 Share Posted August 25, 2023 Wasn't this the site of the old Orion proposal from the early 2000s? 1 Quote Link to comment Share on other sites More sharing options...
Urbannizer Posted August 25, 2023 Share Posted August 25, 2023 12 minutes ago, ChannelTwoNews said: Wasn't this the site of the old Orion proposal from the early 2000s? Orion was proposed for the vacant land across Asbury. 2 Quote Link to comment Share on other sites More sharing options...
j.33 Posted August 25, 2023 Share Posted August 25, 2023 This is the site of the model for the old Orion. 1 Quote Link to comment Share on other sites More sharing options...
strickn Posted August 25, 2023 Share Posted August 25, 2023 The building in the street view was Orion's matching sales center 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted October 28, 2023 Author Share Posted October 28, 2023 Plan Review Fee. 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted October 31, 2023 Author Share Posted October 31, 2023 5 Quote Link to comment Share on other sites More sharing options...
Popular Post Paco Jones Posted November 2, 2023 Popular Post Share Posted November 2, 2023 Project: Riverview Address: 8 Asbury Place Houston, TX 77007 Architect: Goree Developer: Randall Davis Company General Contractor: GT Leach Information: 7-story condominium building with 223 units. The exterior is primarily masonry (dark areas) and EIFS (light areas). Outdoor pickleball courts and terrace at Level 7. Indoor pool also at Level 7. 15 Quote Link to comment Share on other sites More sharing options...
hindesky Posted December 30, 2023 Author Share Posted December 30, 2023 Moving truck is loading out the contents of the house. I could see a demo permit in it's future. 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted January 12 Author Share Posted January 12 Looks like they are gutting the interior. Looking north. 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted February 2 Author Share Posted February 2 (edited) Those vehicles in pic 1 belong to a guy who has done work for Randall Davis, he cuts down the trees and sell the ones that are worth using for firewood or for BBQ. He said he brought with him some guys that will bid on the demo portion. Lots of new surveyor stakes through out the property. Edited February 2 by hindesky 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted February 2 Author Share Posted February 2 6 Quote Link to comment Share on other sites More sharing options...
hindesky Posted February 10 Author Share Posted February 10 6 2 Quote Link to comment Share on other sites More sharing options...
HoustonIsHome Posted February 14 Share Posted February 14 What am interesting looking property. I'm going to have to look up the story behind it Quote Link to comment Share on other sites More sharing options...
j.33 Posted February 14 Share Posted February 14 (edited) 2 hours ago, HoustonIsHome said: What am interesting looking property. I'm going to have to look up the story behind it It is the old model showroom for the cancelled "Orion" condo project that was supposed to be built next door. The model showroom was then actually used as a home up until 2020ish. The parking lot was built to accommodate the showroom traffic way back in the day and when the project went bust, the parking lot was used for Brenners. Edited February 14 by Justin Welling 6 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted March 6 Author Share Posted March 6 Water hook up has been taken out. 1 Quote Link to comment Share on other sites More sharing options...
BEES?! Posted March 25 Share Posted March 25 Did that building flood (during Harvey)? It seems like it really wasn't built up. Quote Link to comment Share on other sites More sharing options...
j.33 Posted March 25 Share Posted March 25 9 hours ago, BEES?! said: Did that building flood (during Harvey)? It seems like it really wasn't built up. From what I can remember, it did not. Water did get pretty close. 1 Quote Link to comment Share on other sites More sharing options...
KirbyDriveKid Posted March 27 Share Posted March 27 On 2/14/2024 at 3:30 PM, j.33 said: It is the old model showroom for the cancelled "Orion" condo project that was supposed to be built next door. The model showroom was then actually used as a home up until 2020ish. The parking lot was built to accommodate the showroom traffic way back in the day and when the project went bust, the parking lot was used for Brenners. *bows* The collective knowledge of this forum is really remarkable Quote Link to comment Share on other sites More sharing options...
hindesky Posted May 9 Author Share Posted May 9 Interior has been gutted. 6 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 15 Author Share Posted June 15 (edited) COH demolition permit. Edited June 15 by hindesky 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 15 Author Share Posted June 15 2 Quote Link to comment Share on other sites More sharing options...
HTX1121 Posted June 15 Share Posted June 15 The dinero just came through this week…. 2 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 15 Author Share Posted June 15 3 box containers trailers are on site, 2 of them say GT Leach on them which will be the GC. Mock ups of the bricks and rock to be used. Somewhere back in the jungle is the Asbury 5 building to be demolished. 4 Quote Link to comment Share on other sites More sharing options...
HTX1121 Posted June 15 Share Posted June 15 the two stone sample mockups on the right are actually for The Beverly 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted June 18 Author Share Posted June 18 ADT Demolition has started on the 5 Asbury building. https://adtdemolition.com 4 Quote Link to comment Share on other sites More sharing options...
hindesky Posted Saturday at 08:47 PM Author Share Posted Saturday at 08:47 PM The old Orion sales center has been demolished and was being trucked out. I talked with the GF from GT Leach who said they will be starting in about 1 week after the trees are removed. He said they had to bring a city arborists to see which trees they can cut down and how many they will have to replace when finished, the trees had badges with flagging on them. He said it will have a tower crane if the concrete contractor needs it to build the parking garage. He wasn't sure yet if it will be a cast in place or precast or who is doing the job. 3 1 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.