Jump to content

Highrise Tower

Moderator
  • Posts

    12,625
  • Joined

  • Days Won

    456

Everything posted by Highrise Tower

  1. wow! That interior.. Reminds me of the BBVA Compass Plaza at 2200 Post Oak Boulevard. They also had a (curved) wood ceiling design.
  2. Rumor has it construction won't start until after the 2017 holidays. Maybe site work prep until then?
  3. Really like the exterior lighting in the dark. Beautiful! Bellaire Building's signage is still up. Compare the two
  4. Is that a big piece of machinery in the middle of 59/610? See if every day while I drive to work. Can't be an irresponsible driver and take a photo
  5. Phase II started! Curb side pickup (and a entertainment stage?) This is on the Westheimer side.
  6. Got a new job located in the Koch building! Twenty Greenway Plaza View from the 7th floor patio. Wider shot.. Uptown is my favorite
  7. 610 East is down to one lane right now? Sounds like a nightmare during rush hour.
  8. Not a fan of the Meyerland Plaza location, but I'm a HEB fanatic so any new updated store (2 story even!) is good with me. Is that source legit? Anybody else reporting this. I see "rumor"
  9. Photos from today! So massive! Wonder if they'll have beer on tap? Or maybe an exclusive H-E-B brewery? Gotta compete with Whole Foods Post Oak!
  10. Amazon/Beezos is a sensitive subject for some, but I've read that the Washington Post is now in troubles with employee benefits. Beezo's is only matching 1% of the employee 401k's at the Washington Post. Another article: https://www.huffingtonpost.com/entry/washington-post-jeff-bezos_us_59df9245e4b00abf3646fff9?hgc
  11. Thanks for bumping the thread. Not sure if it's related but I just noticed several construction signs on 610 near the Bellaire/Bissonnett/Fournace exit. Think the signs specified "Construction begins in the next 1/2 mile"
  12. Do we start a new thread for the 610/59 interchange? This is going to be a madhouse and I might need a place to vent Plus construction photos, etc.
×
×
  • Create New...