asubrt Posted May 6, 2021 Share Posted May 6, 2021 On 12/5/2020 at 10:04 PM, asubrt said: The other tower crane came down today, but there continues to be minimal apparent progress despite continued work. Still lacking most windows except for the lowest floors of the tower. They are FINALLY up to the top two floors with the windows. This is taking forever, it seemed to be rising quickly at first but now it reminds me of Block 334 downtown that took like 4 years to finish for a midrise apartment complex. 4 Quote Link to comment Share on other sites More sharing options...
Popular Post Paco Jones Posted July 14, 2021 Popular Post Share Posted July 14, 2021 It looks like the 9753 nine-story office building is slated to start back up the first of quarter 2022. Changes on the exterior, so permits were required. 20 Quote Link to comment Share on other sites More sharing options...
asubrt Posted July 15, 2021 Share Posted July 15, 2021 3 hours ago, Paco Jones said: It looks like the 9753 nine-story office building is slated to start back up the first of quarter 2022. Changes on the exterior, so permits were required. Awesome! It's been weird seeing it just sitting there with the first above ground floor poured and rebar sticking out for months. Also they were putting up signage on the top of the east face of the residential high-rise this morning, looked pretty good but they only had "McK" when I drove by so we'll see how the whole thing looks. 2 Quote Link to comment Share on other sites More sharing options...
tangledwoods Posted July 15, 2021 Share Posted July 15, 2021 this is one of the most refreshingly new glass box tower designs I have seen in the last few years. WOW, nice to see some good architecture in the commercial office space!!! 6 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted September 26, 2021 Share Posted September 26, 2021 The Lawn will be getting a Common Bond On The Go. 6 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted October 10, 2021 Share Posted October 10, 2021 The Lawn under construction. Bigger site than I thought. 7 Quote Link to comment Share on other sites More sharing options...
hindesky Posted October 10, 2021 Share Posted October 10, 2021 The Discovery Green of Memorial? How a Houston developer plans to transform The Lawn MetroNational, the Houston developer and owner of Memorial City, aims to create a community space in its plans for expanding The Lawn at Memorial City. Near Interstate 10 and Bunker Hill, The Lawn will serve as a venue for festivals, markets, movies and concerts throughout the year and a place for nearby office workers and apartment dwellers to get some fresh air or have an impromptu meeting. The Lawn is next to Hotel ZaZa Memorial City and The McKinley, MetroNational’s new 25-story apartment tower. MetroNational is using space previously designated for a restaurant to expand The Lawn to 30,000 square feet. Plans call for a covered structure and performance space called The Arbor, seating areas, water features, play equipment, game tables and a restaurant. The space could accommodate about 250 people at live performances and could be rented for private events such as weddings. “With COVID happening and everything else, greenspace was something that just about everyone was clamoring for,” said Jason Johnson, president of MetroNational. “We think it’s going to be something that’s going to last for a long time and going to be utilized by everybody.” The project will feature a series of shaded gathering areas and courtyards. Five live oak trees that were moved off-site to make way for The McKinley apartments nearly four years ago are being returned and used in the expansion, along with smaller elm and oak trees. The work will more than double the size of The Lawn, which opened in 2017. Construction is underway with completion planned in December. MatroNational’s Memorial City development spans 300 acres, with almost 10 million square feet of space in hotels, medical buildings, retail stores, offices and apartments. While MetroNational is still developing a master plan for the Sears site at Memorial City Mall, greenspace will definitely factor in, Johnson said. The mall is being redeveloped after Sears closed and was razed last year. The Lawn is near 1.5 million square feet of newer office buildings in Memorial City, Johnson said. The space, which includes tenants such as Air Liquide, Murphy Exploration and Nexen, is 95 percent leased. Also in the Memorial area, Levcor is redesigning its MarqE retail complex near Interstate 10 at Silber with outdoor gathering areas and shade structures. https://www.houstonchronicle.com/business/real-estate/article/Memorial-City-developer-unveils-plans-for-16517499.php 7 Quote Link to comment Share on other sites More sharing options...
gene Posted October 12, 2021 Share Posted October 12, 2021 Wow just catching up on this thread as my friend and co-worker is moving into this development Nov 2nd! I am excited for her...this building and The Lawn look and sound amazing! 2 Quote Link to comment Share on other sites More sharing options...
Popular Post Nate_56 Posted January 20, 2022 Popular Post Share Posted January 20, 2022 15 Quote Link to comment Share on other sites More sharing options...
toxtethogrady Posted February 2, 2022 Share Posted February 2, 2022 What part of China is this? 1 Quote Link to comment Share on other sites More sharing options...
Popular Post asubrt Posted April 12, 2022 Popular Post Share Posted April 12, 2022 On 7/14/2021 at 5:29 PM, Paco Jones said: It looks like the 9753 nine-story office building is slated to start back up the first of quarter 2022. Changes on the exterior, so permits were required. It sure looked like a tower crane was going up here today. I was kind of far away so couldn’t confirm that it was here, but I don’t know where else it could have been 10 1 Quote Link to comment Share on other sites More sharing options...
por favor gracias Posted April 12, 2022 Share Posted April 12, 2022 3 hours ago, asubrt said: It sure looked like a tower crane was going up here today. I was kind of far away so couldn’t confirm that it was here, but I don’t know where else it could have been I drove by around noon and they were putting it up...drove by again this evening and it's up all the way. 6 Quote Link to comment Share on other sites More sharing options...
Popular Post hindesky Posted April 19, 2022 Popular Post Share Posted April 19, 2022 ConnectCre reports.... "MetroNational, the Houston-based, privately-held real estate investment, development, and management company, has begun construction for a Class A office building." https://www.connectcre.com/stories/construction-begins-on-memorial-city-class-a-office-tower-in-katy-tx/ 10 1 Quote Link to comment Share on other sites More sharing options...
Popular Post 79ta Posted August 2, 2022 Popular Post Share Posted August 2, 2022 From today 9 1 Quote Link to comment Share on other sites More sharing options...
kennyc05 Posted August 3, 2022 Share Posted August 3, 2022 11 hours ago, 79ta said: From today Wow! I haven't been in this area in about 3 months they're throwing this one up quick!!! 2 Quote Link to comment Share on other sites More sharing options...
Popular Post ChannelTwoNews Posted August 16, 2022 Popular Post Share Posted August 16, 2022 (edited) Office building topped out - ceremony was yesterday https://www.bizjournals.com/houston/news/2022/08/15/metronational-topping-out-office-tower.html Edited August 16, 2022 by ChannelTwoNews 14 Quote Link to comment Share on other sites More sharing options...
kennyc05 Posted August 16, 2022 Share Posted August 16, 2022 Wow that was quick! . 3 Quote Link to comment Share on other sites More sharing options...
asubrt Posted September 3, 2022 Share Posted September 3, 2022 The structure flew up so quickly, but it really seems to have slowed to a crawl since topping out. Still no evidence of any cladding/facade, and there never seem to be more than a few workers on site at any given time. 5 Quote Link to comment Share on other sites More sharing options...
ChannelTwoNews Posted September 28, 2022 Share Posted September 28, 2022 BW Energy Management USA takes 68KSF on the top three floors of the office building https://www.houstonchronicle.com/business/real-estate/article/Oil-and-gas-company-inks-HQ-lease-at-new-Memorial-17457230.php 7 Quote Link to comment Share on other sites More sharing options...
Popular Post freundb Posted November 1, 2022 Popular Post Share Posted November 1, 2022 They've been adding glass recently. 10 Quote Link to comment Share on other sites More sharing options...
hindesky Posted January 3, 2023 Share Posted January 3, 2023 "The independent oil and natural gas company plans to relocate its headquarters from 2000 West Sam Houston Parkway S., just 5 miles away from its new digs, in the second half of 2024. Callon Petroleum’s current headquarters occupies 75K SF, while its new 107K SF space is the 10th-largest Houston office lease of 2022, the Houston Chronicle reported." https://www.bisnow.com/houston 5 Quote Link to comment Share on other sites More sharing options...
Houston19514 Posted January 3, 2023 Share Posted January 3, 2023 3 minutes ago, hindesky said: "The independent oil and natural gas company plans to relocate its headquarters from 2000 West Sam Houston Parkway S., just 5 miles away from its new digs, in the second half of 2024. Callon Petroleum’s current headquarters occupies 75K SF, while its new 107K SF space is the 10th-largest Houston office lease of 2022, the Houston Chronicle reported." https://www.bisnow.com/houston It's nice to see one of these companies making an inward move. 1 Quote Link to comment Share on other sites More sharing options...
texan Posted January 3, 2023 Share Posted January 3, 2023 And even more exiting news: Quote The newest lease paves the way for MetroNational to start work on the next office building in Memorial City, according to Jason Johnson, its president. Quote MetroNational is in the design and site selection phase for the development's next office building, according to the company. https://www.houstonchronicle.com/business/real-estate/article/Callon-Petroleum-office-lease-Memorial-City-17691481.php 4 Quote Link to comment Share on other sites More sharing options...
79ta Posted June 16, 2023 Share Posted June 16, 2023 This is an article about a Hines mass timber project but had this note. Quote Memorial City's 3.5 million square feet of office space across 11 buildings is 95 percent occupied, according to MetroNational. Its newest building at 9753 Katy Freeway, which is slated to open in October, is fully leased. New retail places are being developed at Memorial City Mall, which opened in 1966. https://www.houstonchronicle.com/business/real-estate/article/bucees-founder-texas-a-m-hines-mass-timber-18152806.php 6 Quote Link to comment Share on other sites More sharing options...
79ta Posted June 29, 2023 Share Posted June 29, 2023 Fully leased and now a tax break too. Quote Houston granted a green design tax break to a nine-story, office tower under construction in the Memorial City area... City Council voted unanimously Wednesday to approve the 10-year tax abatement deal with the developer of a $45.5 million office and retail building at 9753 Katy Freeway. The 190,000-square-foot project first broke ground in 2019 but was halted for two years during the COVID-19 pandemic. Since resuming construction in April, it has landed a major leasing contract with Callon Petroleum and is slated to open next year. The 5 percent tax break, projected to amount to about $118,000 over the next 10 years, should help cover the cost of obtaining a Leadership in Energy and Environmental Design (LEED) certification, city officials said. The certification is a distinction from the U.S. Green Building Council acknowledging designs that address sustainability challenges including energy, water and waste. https://www.houstonchronicle.com/politics/houston/article/memorial-city-tower-green-tax-break-houston-18172919.php 3 Quote Link to comment Share on other sites More sharing options...
IntheKnowHouston Posted July 20, 2023 Share Posted July 20, 2023 Goode Company is leasing the ground level restaurant space at The McKinley. The local restaurant group operates the following restaurants: Goode Co. Barbeque Goode Co. Seafood Goode Co. Taqueria Goode Co. Kitchen & Cantina Goode Co. Armadillo Palace Goode Co. Fish Camp As for the restaurant opening at The McKinley, it will be a new dining concept named Credence. Sidebar is the name of the on-site bar. I don't know when the restaurant and bar will open. The address for Credence and Sidebar is 9757 Katy Fwy, Ste 170 ( 9757 Katy Freeway, Suite 170). There is a web domain for Credence, but the website is not live. Also, Credence has an Instagram account. http://www.credencehtx.com/ https://www.instagram.com/credencehtx/ Quote Link to comment Share on other sites More sharing options...
MrFubbles Posted July 20, 2023 Share Posted July 20, 2023 Is this project a part of the Pickard Chilton urban master plan? https://www.pickardchilton.com/work/urban-master-plan Quote Link to comment Share on other sites More sharing options...
IntheKnowHouston Posted September 12, 2023 Share Posted September 12, 2023 On 7/20/2023 at 11:20 AM, IntheKnowHouston said: As for the restaurant opening at The McKinley, it will be a new dining concept named Credence. Sidebar is the name of the on-site bar. I don't know when the restaurant and bar will open. The address for Credence and Sidebar is 9757 Katy Fwy, Ste 170 ( 9757 Katy Freeway, Suite 170). There is a web domain for Credence, but the website is not live. Also, Credence has an Instagram account. http://www.credencehtx.com/ https://www.instagram.com/credencehtx/ Goode Co. formally announced two new concepts coming to The McKinley: Credence and Sidebar (9757 Katy Fwy, Ste 170). Additional details published on Houston Chronicle today: By summer 2024, the first two projects, an upscale restaurant and speakeasy-style bar and restaurant, are planned to open side by side at 9757 Katy Freeway. The restaurant, Credence, inspired by South Texas ranches, will feature live-fire cooking centering on Gulf seafood, Texas beef and familiar Southern dishes. Next door, Sidebar, will be a reservation-only restaurant and cocktail bar where fine wine and classic cocktails will be served alongside a menu of dry-aged steaks and caviar-topped oysters. Both will be set within the McKinley luxury apartments tower in Memorial City. https://www.houstonchronicle.com/food-culture/restaurants-bars/article/goode-company-restaurants-levi-goode-brand-18355318.php 6 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.