MaxConcrete Posted October 30, 2017 Share Posted October 30, 2017 The construction sign says it's a $5.7 million project. That's quite expensive for a pedestrian bridge, and the pier/tower is very large. Only one tower is under construction, there appears to be no activity on the other side of the bayou. 5 Quote Link to comment Share on other sites More sharing options...
htownbro Posted October 30, 2017 Share Posted October 30, 2017 15 hours ago, MaxConcrete said: The construction sign says it's a $5.7 million project. That's quite expensive for a pedestrian bridge, and the pier/tower is very large. Only one tower is under construction, there appears to be no activity on the other side of the bayou. Where is this? 3 Quote Link to comment Share on other sites More sharing options...
Houston19514 Posted October 30, 2017 Share Posted October 30, 2017 (edited) Edited October 30, 2017 by Houston19514 9 Quote Link to comment Share on other sites More sharing options...
Houston19514 Posted October 30, 2017 Share Posted October 30, 2017 (edited) 16 hours ago, MaxConcrete said: The construction sign says it's a $5.7 million project. That's quite expensive for a pedestrian bridge, and the pier/tower is very large. Only one tower is under construction, there appears to be no activity on the other side of the bayou. This bridge will be 485 feet long and includes lighting and plazas with seating areas at each end of the bridge. In comparison, the Bill Coats Bridge across Brays Bayou in Hermann Park is 290 feet long and cost $5 Million in 2012. Edited October 30, 2017 by Houston19514 4 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.