SkylineView Posted September 3, 2018 Share Posted September 3, 2018 I'm pretty sure the equipment is related to ongoing utility work on Post Oak Lane. The crew has been working south from the 4 Oaks complex over the last few months. 1 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted November 5, 2018 Share Posted November 5, 2018 From today 1 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted December 23, 2018 Share Posted December 23, 2018 This one is off to a slow start. I saw spools of colored tubing at the site today. Not sure if that's COH PWE related Quote Link to comment Share on other sites More sharing options...
SkylineView Posted December 26, 2018 Share Posted December 26, 2018 Still COH PWE. Basically a holding yard for work ongoing in Tanglewood to the west. 1 Quote Link to comment Share on other sites More sharing options...
EllenOlenska Posted December 26, 2018 Share Posted December 26, 2018 I know a lot of people like the new design but for me this is the ultimate Hotel Alessandra. In fact, it's more Alessandra than Alessandra. 1 Quote Link to comment Share on other sites More sharing options...
bobruss Posted December 27, 2018 Share Posted December 27, 2018 Ellen did you see the posting on July 14th of the billboard with a rendering of the actual building. Nothing like the conceptual rendering posted earlier by Urbannizer. 1 Quote Link to comment Share on other sites More sharing options...
Urbannizer Posted March 4, 2019 Author Share Posted March 4, 2019 This is moving forward, on the planning commission agenda. 2 Quote Link to comment Share on other sites More sharing options...
Urbannizer Posted March 7, 2019 Author Share Posted March 7, 2019 SubdivisionPlatPDF_West Oaks Plat No 2 Partial Replat No 3_plat.pdf 1 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted April 5, 2019 Share Posted April 5, 2019 Saw concrete being poured. Sadly, it was only extra. Not related to the project. The engineer and I talked about McNair's future plan of the site and area. Big improvements coming. 3 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted August 25, 2019 Share Posted August 25, 2019 The COH equipment is gone. I was told McNair Interests owns this land and has a lot of improvements planned. McNair wants to upgrade the utilities and streetscape around S. Post Oak Ln. 5 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted November 6, 2019 Share Posted November 6, 2019 New Loopnet listing. https://www.loopnet.com/Listing/S-Post-Oak-Ln-And-Wynden-Dr-Houston-TX/17543114/ 6 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted December 20, 2020 Share Posted December 20, 2020 Flags are surrounding the site. 6 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted January 31, 2021 Share Posted January 31, 2021 Porta-potty on site. 6 Quote Link to comment Share on other sites More sharing options...
Popular Post Highrise Tower Posted March 28, 2021 Popular Post Share Posted March 28, 2021 On 3/22/2021 at 11:33 AM, WestUdweller said: There is a new traffic signal being installed at the intersection of South Post Oak Lane and Longmont. 11 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted September 26, 2021 Share Posted September 26, 2021 McNair moving forward with something. A restaurant? I know the medical tower had a restaurant in the lobby. Quote Link to comment Share on other sites More sharing options...
Popular Post Paco Jones Posted December 6, 2022 Popular Post Share Posted December 6, 2022 (edited) Project: Tanglewood Multifamily Owner/Developer: Palmetto Wynden LP (McNair Interests and Adelaide Real Estate) Architect: Kirksey Information: Mixed-Use project with office, multifamily residential, and structured parking podium components located on South Post Oak Lane at N. Wynden Rd. The building is a 17-story multifamily tower with an integrated shared podium garage structure (garage levels 1-4). The total gross building is approximately 439,500 square feet with 325,000 GSF of multifamily residential space (248 units) and a full complement of resident amenities. Also about 5,000 GSF of ground level commercial lease space. https://i.imgur.com/oKaen8U.jpg https://i.imgur.com/tW6D2tw.jpg https://i.imgur.com/nGBeyzD.jpg https://i.imgur.com/NAAl5B9.jpg https://i.imgur.com/MtJM59O.jpg https://i.imgur.com/gMBLGE3.jpg https://i.imgur.com/eyH7yrU.jpg https://i.imgur.com/IncNyWK.jpg https://i.imgur.com/ApBlhXP.jpg https://i.imgur.com/EeMhGIU.jpg https://i.imgur.com/eTfqoli.jpg https://i.imgur.com/E1hyRM8.jpg https://i.imgur.com/4CUqOgU.jpg Edited December 6, 2022 by Paco Jones 19 Quote Link to comment Share on other sites More sharing options...
Popular Post Highrise Tower Posted January 22 Popular Post Share Posted January 22 Now registered with TDLR! Project Name: McNair Tanglewood Multifamily Location Address: 1111 South Post Oak Lane Start Date: 5/6/2024 Estimated Cost: $116,000.00 Scope of Work: 18-story concrete frame multifamily tower Square Footage: 636,808 ft 2 Design Firm Name: Kirksey Architecture 10 Quote Link to comment Share on other sites More sharing options...
monarch Posted January 22 Share Posted January 22 8 hours ago, Highrise Tower said: Now registered with TDLR! Project Name: McNair Tanglewood Multifamily Location Address: 1111 South Post Oak Lane Start Date: 5/6/2024 Estimated Cost: $116,000.00 Scope of Work: 18-story concrete frame multifamily tower Square Footage: 636,808 ft 2 Design Firm Name: Kirksey Architecture ^^^ did you say "MCNAIR"...? oh my gosh, we're being punked! how many times have we witnessed this very same scenario? development in the queue that NEVER comes to fruition. why do they keep playing these games with us...? Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted January 28 Share Posted January 28 Site visit today. The property is now fenced since the last time I stopped by. 5 Quote Link to comment Share on other sites More sharing options...
Popular Post Urbannizer Posted July 15 Author Popular Post Share Posted July 15 See page 211 https://issuu.com/portfolioma/docs/20240701_-_munoz_albin_architects_-_book_for_print/210?ff&experiment=previewReaderTestMode,new-bff-links-purchased,new-bff-overlay 10 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.