Highrise Tower Posted September 19, 2018 Share Posted September 19, 2018 http://www.walterpmoore.com/projects/hilton-canopy-hotel The new 24-story boutique Canopy by Hilton hotel will provide a fresh façade downtown in the San Antonio’s world famous River Walk in the heart of downtown with numerous area restaurants, bars and entertainment venues. Construction began in January 2017 and the hotel will open in the Fall of 2018. The hotel connects three existing buildings – the MIC building, Esquire Tavern, and Sullivan Bank. The MIC building will be replaced entirely by the boutique hotel all while enveloping the Sullivan Bank building due to its historic significance. Sullivan Bank will be restored and reworked into the new structure all while maintaining the historic integrity of the Office of Historic Preservation of San Antonio. Esquire Tavern is not part of the new development however a portion of the cantilever will protrude over the existing space, necessitating careful construction coordination to avoid disrupting operations of the tavern. When faced with challenge of construction on a tight city site and preserving existing buildings, the team provided an innovative design solutions featuring cantilevered transfer walls. The team’s design balances the need to preserve the existing buildings while providing the new 3,000 square feet of meeting space, 195 rooms and a restaurant with an outdoor terrace overlooking the River Walk. Architect Gensler Construction Cost $40 million Completion Date March 2018 Project Size 115,000 SF 18 floors 197-key 1 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted September 19, 2018 Author Share Posted September 19, 2018 Quote Link to comment Share on other sites More sharing options...
Rowdy Posted September 19, 2018 Share Posted September 19, 2018 8 hours ago, ekdrm2d1 said: http://www.walterpmoore.com/projects/hilton-canopy-hotel Cool! Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted September 20, 2018 Author Share Posted September 20, 2018 The base to resident floors is wild. Surly that’s just a prelim design? Sounds like a design game changer Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted September 22, 2018 Author Share Posted September 22, 2018 Awesome bottom/base design! Please be built like this Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted September 22, 2018 Author Share Posted September 22, 2018 Photos from this week. Had no idea this was being built until I stayed down the street. 1 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted October 6, 2018 Author Share Posted October 6, 2018 Will there be a webcam for this? I'm in a different city so I cannot watch this go up. Quote Link to comment Share on other sites More sharing options...
Urbannizer Posted October 17, 2018 Share Posted October 17, 2018 On 10/6/2018 at 3:11 PM, ekdrm2d1 said: Will there be a webcam for this? I'm in a different city so I cannot watch this go up. https://app.oxblue.com/open/sundt/hiltoncanopy Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted December 15, 2018 Author Share Posted December 15, 2018 This is on the 2nd or 3rd story? I'll take a screen grab from the webcam Quote Link to comment Share on other sites More sharing options...