Jump to content

Voltera EV Charging Station At 1505 Haddon St.


Highrise Tower

Recommended Posts

Diffco obtained a plumbing permit for 1505 Haddon St yesterday.

Details from the permit:

  • Use: (M of 6) EV charging station w/ sitework 1-1-2-B-B '21 IBC
  • FCC Group: Structures other than buildings


As discussed, Voltera is building an electric vehicle charging station on the property.


http://www.cohtora.houstontx.gov/ibi_apps/WFServlet.ibfs?IBIF_webapp=/ibi_apps&IBIC_server=EDASERVE&IBIWF_msgviewer=OFF&IBIAPP_app=soldpermits&IBIF_ex=sold_permit_d&CLICKED_ON=&PN=24047649&PT=12

V4Qvn8U.png
 

  • Like 1
Link to comment
Share on other sites

On 9/17/2024 at 2:28 PM, hindesky said:

A supervisor from Mortenson was on site, he said they are the GC for the project. He said they pulled him from the wind energy division and moved him to their new EV Charging division. This will be a fleet EV charging station for Metro buses. Precision Demolition will be taking down the buildings.

https://www.mortenson.com

https://www.precisiondemolition.com

Port a potties are on site.

OZLbkLo.jpeg

On 9/17/2024 at 2:45 PM, j.33 said:

Im confused by this. METRO is installing ev chargers at all of their bus depots and at select transit centers. As someone who watches all of their committee meetings as well, this has never been mentioned. 

Yeah.... there's not a chance METRO is charging full-size buses at this site.

Maybe they are planning something else, but as j.33 said we would have heard about this before.

I fully believe that someone's fleet may be aiming to use this (maybe Cruise? I still don't think they have high-speed charging at their other site) and I hope there is public access.

  • Like 1
Link to comment
Share on other sites

52 minutes ago, wilcal said:

Yeah.... there's not a chance METRO is charging full-size buses at this site.

Maybe they are planning something else, but as j.33 said we would have heard about this before.

I fully believe that someone's fleet may be aiming to use this (maybe Cruise? I still don't think they have high-speed charging at their other site) and I hope there is public access.

I agree -- the entrances/exits as drawn wouldn't support bus entry.  Has to be smaller vehicles.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...