hindesky Posted July 4 Share Posted July 4 3 minutes ago, astrohip said: And which piece is it being built on? Parcel 2. 2 1 Quote Link to comment Share on other sites More sharing options...
Geoff8201 Posted July 4 Share Posted July 4 On 6/29/2024 at 8:22 PM, Urbannizer said: https://www.costar.com/article/1208535689/fully-leased-office-building-in-houstons-greenway-plaza-gets-underway-amid-record-vacancies Unable to read the article without subscribing. Is this a final rendering for Parcel 2, which is currently being worked on now? I have not seen much in the way of updates on what was originally the 13-Story “Jenga” building in older renderings. 4 Quote Link to comment Share on other sites More sharing options...
Popular Post Highrise Tower Posted July 4 Popular Post Share Posted July 4 The new page doesn't have any construction pictures yet. Thought I would add today's photos I took. Really cool to think multiple energy companies are building on an old Exxon campus. Continuing the legacy and I love it! 16 Quote Link to comment Share on other sites More sharing options...
j_cuevas713 Posted July 5 Share Posted July 5 I still have PTSD from Regent Square. I hope this gets fully developed as promised. 3 Quote Link to comment Share on other sites More sharing options...
Geoff8201 Posted July 5 Share Posted July 5 This week’s photo. The hole is getting bigger. I’ll also was finally able to read the Costar article @Urbannizer posted a link to (but required a subscription). Learned some good info I wasn’t aware of before. The Vitol building will be a total of 146,000 square feet in the 2.3 acre Parcel 2 with three levels of the above ground parking garage. Seems the rendering from the article looks accurate to those numbers. What confuses me is are permits that state 479,226 sq ft (the entire property is 740,000 sq ft or 17 acres)…….. Maybe the permits cover multiple parcels for the site work? Transwestern sold the 4.7 acre Parcel 7 at the south end of the property to Oxy and that will be the site of their building in the near future. Felt like I missed this news before. The restaurant / retail portion of the development will occupy 75,000 sq ft. 9 Quote Link to comment Share on other sites More sharing options...
CREguy13 Posted July 6 Share Posted July 6 17 hours ago, j_cuevas713 said: I still have PTSD from Regent Square. I hope this gets fully developed as promised. Fair to have PTSD on Regent Square. The RO will be a very special development for Houston and be a major catalyst for the area. This is not one to be worried about! 5 1 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 6 Share Posted July 6 I posted some pics on IG and someone mentioned Billionaires Row. 1 1 1 Quote Link to comment Share on other sites More sharing options...
Popular Post hindesky Posted July 6 Popular Post Share Posted July 6 12 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted July 7 Share Posted July 7 The retaining wall (parking garage?) is thick! 9 Quote Link to comment Share on other sites More sharing options...
Geoff8201 Posted July 11 Share Posted July 11 That was one serious storm… While doing damage assessment here, looked over to see The RO had quite a lot of water to pump out. Took this just after the storm. I feel bad for whomever had to pick up the blown over port-a-potties. Today it’s a mud pit with more rain expected, but crews are back on site. 7 Quote Link to comment Share on other sites More sharing options...
astrohip Posted July 11 Share Posted July 11 53 minutes ago, Geoff8201 said: That was one serious storm… While doing damage assessment here, looked over to see The RO had quite a lot of water to pump out. Took this just after the storm. I feel bad for whomever had to pick up the blown over port-a-potties. Today it’s a mud pit with more rain expected, but crews are back on site. I'm gonna be really pissed if they have power there, while our bldg of 200 people, which literally overlooks The RO, is going on Day Four of no power. But hey, "assessments" are currently under way. 3 Quote Link to comment Share on other sites More sharing options...
Popular Post Highrise Tower Posted July 14 Popular Post Share Posted July 14 Construction update today. The thick retaining wall is just about half a block completed. Should be completed in a few weeks! The huge hole is indeed getting bigger! I'd imagine this will be a mat foundation given the deep hole? 13 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 16 Share Posted July 16 On 7/11/2024 at 8:35 AM, astrohip said: I'm gonna be really pissed if they have power there Everything they are currently doing is being done with diesel powered equipment including the construction trailer, it has its own generator. 4 Quote Link to comment Share on other sites More sharing options...
Popular Post hindesky Posted July 16 Popular Post Share Posted July 16 From Saturday 13th. 9 1 Quote Link to comment Share on other sites More sharing options...
astrohip Posted July 16 Share Posted July 16 13 hours ago, hindesky said: Everything they are currently doing is being done with diesel powered equipment including the construction trailer, it has its own generator. Thanks, yeah I should have realized this. We ended up getting power Thursday. Better than some folks still waiting... 2 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted July 17 Share Posted July 17 Mid-week construction update. The hole is so large. They're making it wider! 8 Quote Link to comment Share on other sites More sharing options...
Popular Post Geoff8201 Posted July 20 Popular Post Share Posted July 20 (edited) Saturday snapshot. Hole square footage keeps growing! Edited July 20 by Geoff8201 10 2 Quote Link to comment Share on other sites More sharing options...
Popular Post hindesky Posted July 20 Popular Post Share Posted July 20 11 Quote Link to comment Share on other sites More sharing options...
Popular Post Highrise Tower Posted July 21 Popular Post Share Posted July 21 The hole is indeed getting wider! The dig is actually going really fast and is now to the area of the new retaining wall. yeaahh!!! 11 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 23 Share Posted July 23 If these tower crane coordinates for the FAA Obstruction permits are correct these two cranes are going to be pretty close to each other although the taller is 71' higher than the shorter one. 7 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted July 24 Share Posted July 24 Mid-week construction update. 9 Quote Link to comment Share on other sites More sharing options...
hindesky Posted July 27 Share Posted July 27 Parcel 1 water/waste water permit. 5 Quote Link to comment Share on other sites More sharing options...
Popular Post Highrise Tower Posted July 28 Popular Post Share Posted July 28 Construction update today. The hole really is massive! As hindesky posted, a waste water permit was just pulled. Sounds like the building permits are forthcoming! Or maybe I missed them already? Full speed ahead!! A new power box pole went up! Piling update with the thick retention wall. I guess this will wrap the entire Parcel 1? 10 Quote Link to comment Share on other sites More sharing options...
Luminare Posted July 30 Share Posted July 30 Nice to see this one getting started. Feels like forever when the first images dropped. Downloading some consultant models for a project, so had a little down time today. Hope all y'all are doing good. Sorry I haven't been on here in awhile. Y'all know how life works. 6 1 Quote Link to comment Share on other sites More sharing options...
Highrise Tower Posted July 31 Share Posted July 31 Mid-week construction update. 7 Quote Link to comment Share on other sites More sharing options...
Geoff8201 Posted July 31 Share Posted July 31 On 7/23/2024 at 10:27 AM, hindesky said: If these tower crane coordinates for the FAA Obstruction permits are correct these two cranes are going to be pretty close to each other although the taller is 71' higher than the shorter one. They are digging a deep hole within the hole in this exact spot of the first image. I’m guessing for the crane foundation pour. 3 Quote Link to comment Share on other sites More sharing options...
Popular Post Geoff8201 Posted August 1 Popular Post Share Posted August 1 9 1 Quote Link to comment Share on other sites More sharing options...
Popular Post hindesky Posted August 4 Popular Post Share Posted August 4 You can see the 4 pads the tower crane will sit on, AT crane is on site to place at least the base of the tower crane if not the whole tower crane. 10 Quote Link to comment Share on other sites More sharing options...
Popular Post Geoff8201 Posted August 5 Popular Post Share Posted August 5 (edited) Crane base is set! Edited August 5 by Geoff8201 12 Quote Link to comment Share on other sites More sharing options...
Popular Post Highrise Tower Posted August 7 Popular Post Share Posted August 7 Mid-week construction update. Tower crane 1 base: The hole for tower crane 2: 14 2 Quote Link to comment Share on other sites More sharing options...